WIND Metadata Report
Metadata Report
You searched for: ( title : Nevada Interconnection Standards )
Title:New Hampshire Interconnection Standards
Source:ORNL Compiled Interconnection Data Collection
URL or Email:wibkingml@ornl.gov
Resource Type: Collection
Status:Subject to Updates
Access Restrictions: Public
Data Center Contact: Wibking, Melynda - wibkingml@ornl.gov Phone:
Download Data Sets:

Abstract: All electric utilities in New Hampshire are required to provide, upon request, net metering to customers who generate electricity using renewable-energy systems with a maximum capacity of 100 kilowatts (kW). The aggregate limit on net-metered systems is 1.0% of each utility's annual peak load. The New Hampshire Public Utilities Commission (PUC) originally established interconnection rules for net-metered systems in January 2001 (source: http://dsireusa.org/incentives/incentive.cfm?Incentive_Code=NH04R&re=1&ee=1).
Related Resources:New Hampshire Public Utilities Commission
-- N.H. State Rules on Net Metering
Northeast Utilities
-- Generation Facilities' Transmission Interconnection Guideline
-- General Transmission System Design Guidelines for the Interconnection of New Generating Facilities to the Northeast Utilities Transmission System
-- Generator Interconnection Request Form To Obtain Queue Position
Public Service of New Hampshire
-- Net Metering
National Grid
-- Net Metering
-- Granite State Electric Company Interconnection Standards Provision for Inverters Sized Up to 100 KVA
-- Interconnection of Generators
-- Simplified Process Interconnection Application
Database of State Incentives for Renewables & Efficiency
-- New Hampshire
Site Information:
SiteSite URLNorthWestSouthEast
New Hampshire45.43-72.6842.57-70.58



ORNL Home Page    Powered by Mercury