| Title: | New Hampshire Interconnection Standards | |||||||||||||||||
| Source: | ORNL Compiled Interconnection Data Collection | |||||||||||||||||
| URL or Email: | wibkingml@ornl.gov | |||||||||||||||||
| Resource Type: | Collection | |||||||||||||||||
| Status: | Subject to Updates | |||||||||||||||||
| Access Restrictions: | Public | |||||||||||||||||
| Data Center Contact: | Wibking, Melynda
-
wibkingml@ornl.gov
Phone:
|
|||||||||||||||||
| Download Data Sets: |
|
|||||||||||||||||
| Abstract: | All electric utilities in New Hampshire are required to provide, upon request, net metering to customers who generate electricity using renewable-energy systems with a maximum capacity of 100 kilowatts (kW). The aggregate limit on net-metered systems is 1.0% of each utility's annual peak load. The New Hampshire Public Utilities Commission (PUC) originally established interconnection rules for net-metered systems in January 2001 (source: http://dsireusa.org/incentives/incentive.cfm?Incentive_Code=NH04R&re=1&ee=1). | |||||||||||||||||
| Related Resources: | New Hampshire Public Utilities Commission
-- N.H. State Rules on Net Metering Northeast Utilities -- Generation Facilities' Transmission Interconnection Guideline -- General Transmission System Design Guidelines for the Interconnection of New Generating Facilities to the Northeast Utilities Transmission System -- Generator Interconnection Request Form To Obtain Queue Position Public Service of New Hampshire -- Net Metering National Grid -- Net Metering -- Granite State Electric Company Interconnection Standards Provision for Inverters Sized Up to 100 KVA -- Interconnection of Generators -- Simplified Process Interconnection Application Database of State Incentives for Renewables & Efficiency -- New Hampshire |
|||||||||||||||||
| Site Information: |
|
|||||||||||||||||